Services · Compliance, risk & safety
Risk,priced before it is inherited.
The expensive surprises on energy projects are rarely technical. They are contractual, regulatory or safety events that were visible months earlier. Belgineer builds the systems that make them visible.
ISO 14001
Environmental management discipline
PMI PMP
Certified project management
Lenders, utilities and regulators expect evidence: a living risk register, quality records that trace every test, environmental management to ISO 14001 and a safety culture that holds on the busiest day on site. Without them, projects lose time to inspections, disputes and stoppages.
Levent Belgin’s professional development spans multiple EHS certifications, ISO 14001 environmental management, information security, disaster preparedness, fire fighting and first aid, alongside contract management and business conduct training. Belgineer applies that discipline to every engagement.
- 01
Risk management
Risk registers, quantified mitigations and owner reporting that keep risk visible from tender to handover.
- 02
Quality assurance
QA/QC plans, inspection and test plans and audit-ready records for every system.
- 03
EHS leadership
Site safety systems, permit-to-work, emergency preparedness and a safety culture that is led, not enforced.
- 04
Environmental management
ISO 14001-aligned environmental management across construction and commissioning.
- 05
Contract compliance
Obligations, notices, variations and claims tracked so rights are preserved and penalties avoided.
- 06
Information security & conduct
Document control, information security and business conduct governance.
01
Identify
Map technical, commercial, regulatory and safety risks at the start.
02
Price
Quantify risks so decisions are made on cost, not on hope.
03
Control
Assign owners, mitigations and triggers — and review them on a fixed rhythm.
04
Evidence
Keep records that satisfy lenders, utilities and auditors without a scramble.
51 projects6,662 MWe of generation
Projects in this discipline, plotted where they were built.
- Siverek SPP + BESSŞanlıurfa7.5 MWe
- Hungary SPPHungary28 MWe
- BOTAŞ Silivri NGSPSilivri, İstanbul2021–2025
- TEİAŞ Tarsus OSB TMMersin2024–2025
- EÜAŞ MobilePacMultiple sites175 MWe
- TEİAŞ Selimiye GISSelimiye2024–2025
- Hacıhıdırlar WPPTürkiye2024–2025
- Bilkent Integrated Health CampusAnkara2016–2021
- Turkcell DatacenterÇorlu2016–2021
- Dem İlaç Production FacilityYalova2016–2021
- Siemens Gebze FacilityGebze1 MWe
- Anot GroupEskişehir2016–2021
- Mondialenobel Factories 1 & 2Lüleburgaz2016–2021
- Iraq-5PP CCPPIraq — five plants3,990 MWe
- Akköy II HEPPKürtün, Gümüşhane270 MWe
- Kargı Dam & HEPPOsmancık, Çorum100 MWe
- Akköprü Dam & HEPPDalaman, Muğla100 MWe
- Uluabat HEPPNilüfer, Bursa100 MWe
- Uzunçayır HEPPMunzur, Tunceli84 MWe
- Akocak HEPPAraklı, Trabzon80 MWe
- Burçak 1 & 2 HEPPŞebinkarahisar, Giresun73.7 MWe
- Uzundere HEPPİkizdere, Rize62 MWe
- Balkusan 1 & 2 HEPPErmenek, Karaman47 MWe
- Koçlu HEPPYağlıdere, Giresun36 MWe
- Ören HEPPBulancak, Giresun28 MWe
- Egemen 1 & 2 HEPPOsmangazi, Bursa22 MWe
- Kayabükü HEPPMengen, Bolu15 MWe
- Airres4 WPPVize, Kırklareli60.8 MWe
- Poyraz WPPSusurluk, Balıkesir32 MWe
- Acarsoy CCPP SwitchyardHonaz, Denizli2006–2016
- TEİAŞ Hayrat SwitchyardHayrat, Trabzon2006–2016
- TEİAŞ İkitelli Switchyardİstanbul2001–2006
- Çerkezköy OSB CCPP SwitchyardTekirdağ2001–2006
- EÜAŞ Hamitabat CCPPKırklareli2001–2006
- TEİAŞ Çerkezköy SwitchyardÇerkezköy, Tekirdağ2001–2006
- TEİAŞ Ambarlı SwitchyardAmbarlı, İstanbul2001–2006
- TEİAŞ Habipler SwitchyardHabipler, İstanbul2001–2006
- TEİAŞ Kırklareli SwitchyardKırklareli2001–2006
- TEİAŞ Çorlu / Ulaş SwitchyardÇorlu, Tekirdağ2001–2006
- Modern Enerji / Ulaş SwitchyardUlaş, Trakya2001–2006
- Grand National Assembly (TBMM)Ankara1996–2001
- Selatin Tunnelİzmir–Aydın1996–2001
- BSH Profilo FactoryÇerkezköy, Tekirdağ1996–2001
- Arçelik FactoryÇayırova, Kocaeli1996–2001
- Siemens Kartal CampusKartal, İstanbul1996–2001
- Harbiye Military MuseumHarbiye, İstanbul1996–2001
- İMKB — İstanbul Stock Exchangeİstinye, İstanbul1996–2001
- Marks & Spencer Mall ŞaşkınbakkalŞaşkınbakkal, İstanbul1996–2001
- Siemens Ankara OfficeAnkara1996–2001
- Hotels & Residential Blocksİstanbul & Antalya1996–2001
- Ambarlı CCPPİstanbul1,350 MWe
What does a project risk register contain?
Each identified risk with its cause, likelihood, impact, owner, mitigation and trigger — reviewed regularly and linked to schedule and cost contingency.
How does Belgineer approach site safety?
Through EHS leadership: clear systems such as permit-to-work and emergency preparedness, combined with visible management commitment on site.
Can Belgineer help avoid contractual penalties?
Yes. Tracking obligations, notices and variations, and renegotiating where circumstances have changed, protects both schedule and margin — as on the EMTA takeover projects where penalties were avoided.
Is this service available on its own?
Yes. Compliance, risk and EHS support can be engaged standalone or as part of a wider project management mandate.
01
Turnkey delivery & PMC
One accountable lead from engineering review to operations handover.
02
Transmission & substations
Substations to 400 kV, GIS, overhead lines and switchyard extensions.
03
Oil, gas & thermal power
Combined-cycle plants, mobile gas turbines and gas storage — dispatchable capacity.
Have a project inthis discipline?
Tell us where it stands. You will hear back from Levent directly.