Transmission · 2001–2006

TEİAŞ Çerkezköy Switchyard

154 kV feeder extension, OHL, 1.9 km concrete cable trench and 36 kV XLPE cables — Çerkezköy, Tekirdağ.

380 kVOHLDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Controlling & Site Manager at Siemens ICG. The scope, figures and period reflect his project record.

Scope
154 kV feeder extension, OHL, 1.9 km concrete cable trench and 36 kV XLPE cables
Location
Çerkezköy, Tekirdağ
Period
2001–2006
Organisation
Siemens ICG
Role
Project Controlling & Site Manager
Coordinates
41.27° N, 28.03° E