Projects

Thirty-five years,mapped.

Every project on the record, plotted at its site. Filter by discipline, or open a project for its scope, era and role.

Projects on record
51
MWe of generation
6,662
Since
1989
03Selected work

Proof,not promises.

A selection from a record of more than fifty projects taken to Final Acceptance.

  1. EBoP engineering, design and material supply for five combined-cycle plants — Taza, Rumaila, Baiji 1 & 2 and Nasiriyah.

    Location
    Iraq — five plants
    Period
    2006–2016
    GPS
    35.33° N · 44.33° E
    View project
    GTHRSGCCPPDWG BLG-01 · REV ASCALE NTS
  2. Systems integration for Ankara City Hospital: 20+ low-voltage systems, 600+ personnel, margin raised from <10% to 17%+, and a 10-year service contract secured.

    Location
    Ankara
    Period
    2016–2021
    GPS
    39.96° N · 32.78° E
    View project
    H20+ INTEGRATED SYSTEMSDWG BLG-02 · REV ASCALE NTS
  3. Two 135 MWe units with EBoP and 154 kV switchyard, integrated with Akköy I and taken to Final Acceptance.

    Location
    Kürtün, Gümüşhane
    Period
    2006–2016
    GPS
    40.70° N · 38.90° E
    View project
    DAM2 × 135 MWeDWG BLG-03 · REV ASCALE NTS
  4. A 380/154/33 kV substation for TEİAŞ, negotiated at target margin with procedures in place for future scope from Enerjisa.

    Location
    Mersin
    Period
    2024–2025
    GPS
    36.92° N · 34.90° E
    View project
    380 kVOHLDWG BLG-04 · REV ASCALE NTS
  5. Nineteen 3.2 MWe turbines with electrical balance of plant and a 154 kV switchyard in Vize, Kırklareli.

    Location
    Vize, Kırklareli
    Period
    2006–2016
    GPS
    41.57° N · 27.77° E
    View project
    154 kVHUB3.2 MWeDWG BLG-05 · REV ASCALE NTS
  6. A hybrid plant pairing 2.5 MWe of solar with 5 MWe of battery storage for Eninde Energy.

    Location
    Şanlıurfa
    Period
    2024
    GPS
    37.75° N · 39.32° E
    View project
    PV ARRAY · TRACKING28 / 64 MWeDWG BLG-06 · REV ASCALE NTS

The full ledger (51)

Let’s energiseyour project.

Tell us where your project stands. You will hear back from Levent directly, usually within one business day.