Thermal & Gas · 2006–2016
Iraq-5PP CCPP
EBoP engineering, design and material supply for five combined-cycle plants — Taza, Rumaila, Baiji 1 & 2 and Nasiriyah.
3,990MWe
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- EBoP engineering, design and supply — Taza, Rumaila, Baiji 1 & 2, Nasiriyah
- Location
- Iraq — five plants
- Period
- 2006–2016
- Generation capacity
- 3,990 MWe
- Discipline
- Oil, gas & thermal power
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 35.33° N, 44.33° E