Hydro · 2006–2016
Akocak HEPP
2 × 40 MWe EBoP, 154 kV switchyard and civil works — Araklı, Trabzon.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 2 × 40 MWe EBoP, 154 kV switchyard and civil works
- Location
- Araklı, Trabzon
- Period
- 2006–2016
- Generation capacity
- 80 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.90° N, 40.05° E