Hydro · 2006–2016
Akköprü Dam & HEPP
2 × 50 MWe EBoP and 154 kV switchyard — Dalaman, Muğla.

01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 2 × 50 MWe EBoP and 154 kV switchyard
- Location
- Dalaman, Muğla
- Period
- 2006–2016
- Generation capacity
- 100 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 36.95° N, 28.85° E
Have a project inthis discipline?
Tell us where it stands. You will hear back from Levent directly.