Wind · Transmission · 2006–2016

Poyraz WPP

10 × 3.2 MWe EBoP and 154 kV switchyard — Susurluk, Balıkesir.

154 kVHUB3.2 MWeDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.

Scope
10 × 3.2 MWe EBoP and 154 kV switchyard
Location
Susurluk, Balıkesir
Period
2006–2016
Generation capacity
32 MWe
Organisation
Siemens Power Generation
Role
Project Manager
Coordinates
39.91° N, 28.15° E