Hydro · Transmission · 2006–2016
Akköy II HEPP
Two 135 MWe units with EBoP and 154 kV switchyard, integrated with Akköy I and taken to Final Acceptance.
270MWe

01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 2 × 135 MWe EBoP and 154 kV switchyard
- Location
- Kürtün, Gümüşhane
- Period
- 2006–2016
- Generation capacity
- 270 MWe
- Discipline
- HydroelectricTransmission & substations
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.70° N, 38.90° E