Hydro · Transmission · 2006–2016

Akköy II HEPP

Two 135 MWe units with EBoP and 154 kV switchyard, integrated with Akköy I and taken to Final Acceptance.

270MWe

Penstock installation on the mountainside at Akköy II HEPP, Gümüşhane
Photo: Alexandr Duloglo/Meka Beton Santralleri · CC BY-SA 4.0 · Wikimedia Commons
01Context

Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.

Scope
2 × 135 MWe EBoP and 154 kV switchyard
Location
Kürtün, Gümüşhane
Period
2006–2016
Generation capacity
270 MWe
Organisation
Siemens Power Generation
Role
Project Manager
Coordinates
40.70° N, 38.90° E