Hydro · 2006–2016
Burçak 1 & 2 HEPP
73.7 MWe across two plants, EBoP, I&C and 154 kV OHL — Şebinkarahisar, Giresun.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 73.7 MWe across two plants, EBoP, I&C and 154 kV OHL
- Location
- Şebinkarahisar, Giresun
- Period
- 2006–2016
- Generation capacity
- 73.7 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.29° N, 38.42° E
Have a project inthis discipline?
Tell us where it stands. You will hear back from Levent directly.