Hydro · Transmission · 2006–2016
Kargı Dam & HEPP
2 × 50 MWe EBoP, 154 kV switchyard and OHL — Osmancık, Çorum.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
Public record
- Located on the Kızılırmak river, between the Osmancık and Kargı districts of Çorum.
Sources
- Scope
- 2 × 50 MWe EBoP, 154 kV switchyard and OHL
- Location
- Osmancık, Çorum
- Period
- 2006–2016
- Generation capacity
- 100 MWe
- Discipline
- HydroelectricTransmission & substations
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.98° N, 34.80° E