Hydro · Transmission · 2006–2016

Kargı Dam & HEPP

2 × 50 MWe EBoP, 154 kV switchyard and OHL — Osmancık, Çorum.

DAM2 × 135 MWeDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.

Public record

  • Located on the Kızılırmak river, between the Osmancık and Kargı districts of Çorum.

Sources

Scope
2 × 50 MWe EBoP, 154 kV switchyard and OHL
Location
Osmancık, Çorum
Period
2006–2016
Generation capacity
100 MWe
Organisation
Siemens Power Generation
Role
Project Manager
Coordinates
40.98° N, 34.80° E

Have a project inthis discipline?

Tell us where it stands. You will hear back from Levent directly.