Hydro · 2006–2016
Kayabükü HEPP
3 × 5 MWe EBoP and I&C — Mengen, Bolu.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 3 × 5 MWe EBoP and I&C
- Location
- Mengen, Bolu
- Period
- 2006–2016
- Generation capacity
- 15 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.94° N, 32.08° E
Have a project inthis discipline?
Tell us where it stands. You will hear back from Levent directly.