Buildings that run as one system.
A modern hospital or data centre is an energy system with people inside it. Belgineer manages the integration of the low-voltage systems that keep those buildings powered, safe and operational.
$1.3B
Bilkent Integrated Health Campus
20+
Integrated low-voltage systems
Mission-critical buildings combine dozens of systems from different suppliers — building management, fire detection and suppression, access control, CCTV, networks, nurse call, medical imaging — that must work together from the first day of operation.
As Siemens Smart Infrastructure project group manager, Levent Belgin held ultimate accountability for the systems integration of the $1.3B Bilkent Integrated Health Campus in Ankara: 20+ low-voltage systems, a 600+ person organisation, a margin lifted from under 10% to over 17%, and a 10-year service contract secured at handover. Earlier work includes the Turkcell data centre, industrial facilities and the Grand National Assembly of Türkiye.
- 01
Building automation
BMS, SCADA and integration platforms such as Desigo CC that bring every subsystem onto one view.
- 02
Life safety
Fire alarm, FM-200 and other extinguishing systems, public address and evacuation.
- 03
Security
Access control, IP CCTV, intrusion detection and RFID systems.
- 04
IT & networks
Data centre infrastructure, structured cabling, Wi-Fi and communications backbones.
- 05
Healthcare systems
Nurse call, telemedicine, surgery automation and PACS integration.
- 06
Service transition
Operator training, O&M documentation and long-term service contracts.
01
Integrate on paper first
Interfaces between subsystems are specified before any supplier is appointed.
02
Run one organisation
Hundreds of people across disciplines managed through one governance model.
03
Protect the margin
Financial control and change management keep large systems contracts profitable.
04
Hand over a service
Handover leads into long-term maintenance, not a warranty gap.
16 projects1 MWe of generation
Projects in this discipline, plotted where they were built.
- Bilkent Integrated Health CampusAnkara2016–2021
- Turkcell DatacenterÇorlu2016–2021
- Dem İlaç Production FacilityYalova2016–2021
- Siemens Gebze FacilityGebze1 MWe
- Anot GroupEskişehir2016–2021
- Mondialenobel Factories 1 & 2Lüleburgaz2016–2021
- Grand National Assembly (TBMM)Ankara1996–2001
- Selatin Tunnelİzmir–Aydın1996–2001
- BSH Profilo FactoryÇerkezköy, Tekirdağ1996–2001
- Arçelik FactoryÇayırova, Kocaeli1996–2001
- Siemens Kartal CampusKartal, İstanbul1996–2001
- Harbiye Military MuseumHarbiye, İstanbul1996–2001
- İMKB — İstanbul Stock Exchangeİstinye, İstanbul1996–2001
- Marks & Spencer Mall ŞaşkınbakkalŞaşkınbakkal, İstanbul1996–2001
- Siemens Ankara OfficeAnkara1996–2001
- Hotels & Residential Blocksİstanbul & Antalya1996–2001
What is smart infrastructure?
The integrated building systems — automation, energy management, life safety, security and IT — that make large facilities efficient, safe and controllable from one platform.
What was Belgineer’s principal’s role at Bilkent Integrated Health Campus?
As Siemens Smart Infrastructure project group manager, Levent Belgin was accountable for the legal, financial, technical and EHS aspects of the systems integration of the $1.3B campus, leading an organisation of more than 600 people through to Final Acceptance.
Do you work on data centres and industrial facilities?
Yes. The record includes the Turkcell data centre in Çorlu and industrial facilities for Dem İlaç, Siemens, Anot Group and Mondialenobel.
How do you keep large systems contracts profitable?
Through rigorous financial control, scope and change management and early interface definition — on Bilkent, the final margin rose from a projected under 10% to over 17%.
01
Turnkey delivery & PMC
One accountable lead from engineering review to operations handover.
02
Compliance, risk & safety
Risk registers, QA/QC systems, ISO 14001 discipline and site safety culture.
03
Transmission & substations
Substations to 400 kV, GIS, overhead lines and switchyard extensions.
Have a project inthis discipline?
Tell us where it stands. You will hear back from Levent directly.