Infrastructure · 2016–2021

Bilkent Integrated Health Campus

Systems integration for Ankara City Hospital: 20+ low-voltage systems, 600+ personnel, margin raised from <10% to 17%+, and a 10-year service contract secured.

$1.3B

H20+ INTEGRATED SYSTEMSDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Group Manager at Siemens Smart Infrastructure. The scope, figures and period reflect his project record.

Public record

  • Officially opened on 14 March 2019 with 3,704 beds — the largest hospital in Türkiye.
  • Its Siemens Desigo CC building management platform monitors and controls 22 subsystems and more than 800,000 data points — energy, fire safety, HVAC, lighting, access control and CCTV.

Sources

Scope
$1.3B campus — 20+ integrated low-voltage systems, 600+ personnel
Location
Ankara
Period
2016–2021
Organisation
Siemens Smart Infrastructure
Role
Project Group Manager
Coordinates
39.96° N, 32.78° E

Have a project inthis discipline?

Tell us where it stands. You will hear back from Levent directly.