Infrastructure · 2016–2021
Bilkent Integrated Health Campus
Systems integration for Ankara City Hospital: 20+ low-voltage systems, 600+ personnel, margin raised from <10% to 17%+, and a 10-year service contract secured.
$1.3B
01Context
Delivered by Bahtiyar Levent Belgin as Project Group Manager at Siemens Smart Infrastructure. The scope, figures and period reflect his project record.
Public record
- Officially opened on 14 March 2019 with 3,704 beds — the largest hospital in Türkiye.
- Its Siemens Desigo CC building management platform monitors and controls 22 subsystems and more than 800,000 data points — energy, fire safety, HVAC, lighting, access control and CCTV.
Sources
- Scope
- $1.3B campus — 20+ integrated low-voltage systems, 600+ personnel
- Location
- Ankara
- Period
- 2016–2021
- Discipline
- Smart infrastructure
- Organisation
- Siemens Smart Infrastructure
- Role
- Project Group Manager
- Coordinates
- 39.96° N, 32.78° E