Services · Oil, gas & thermal power

Dispatchable power at national scale.

When the wind drops and the sun sets, gas-fired and storage infrastructure keeps the lights on. Belgineer manages the plants and facilities that provide that firm capacity.

3,990

MWe — Iraq-5PP CCPP EBoP

1,350

MWe — Ambarlı CCPP commissioning

GTHRSGCCPPDWG BLG-01 · REV ASCALE NTS
01The firm half of the energy system

Combined-cycle plants and gas infrastructure are dense, high-energy facilities: gas and steam turbines, heat recovery, high-voltage evacuation and extensive control systems, all under strict safety regimes. The electrical and control scope alone can involve thousands of interfaces.

The record spans the full arc: commissioning the 1,350 MWe Ambarlı combined-cycle plant for Siemens AG; EBoP engineering, design and supply for five combined-cycle plants in Iraq totalling 3,990 MWe (Taza, Rumaila, Baiji 1 & 2 and Nasiriyah); switchyards for the Acarsoy, Hamitabat and Çerkezköy plants; upgrades of seven 25 MWe FT8 MobilePac mobile power stations for EÜAŞ; and the BOTAŞ Silivri offshore underground natural gas storage project.

02What we deliver
  1. 01

    CCPP electrical balance of plant

    Generator step-up, auxiliary transformers, MV/LV distribution, DC systems and cabling for gas and steam units.

  2. 02

    Control & instrumentation

    Distributed control systems, signal conditioning and control room integration.

  3. 03

    HV evacuation

    Switchyards and overhead lines that export plant output to the grid.

  4. 04

    Mobile & fast-track power

    Upgrade and redeployment of mobile gas turbine stations under tight timelines.

  5. 05

    Gas storage & infrastructure

    Project management for gas storage and associated electrical and control scopes.

  6. 06

    Test & commissioning

    Systematic commissioning of motors, valves, switchgear, batteries and control systems through to reliability runs.

03How we de-risk it
  1. 01

    Engineer for the whole plant

    EBoP is designed as one system across gas turbine, steam cycle and grid.

  2. 02

    Control the supply chain

    Long-lead equipment and multi-site logistics tracked against the critical path.

  3. 03

    Commission methodically

    System-by-system handover with documented tests and punch lists.

  4. 04

    Safety without compromise

    EHS leadership and permit-to-work discipline in high-energy environments.

05Questions, answered

What is a combined-cycle power plant (CCPP)?

A CCPP burns gas in a gas turbine and uses the hot exhaust to raise steam for a steam turbine, producing more electricity from the same fuel than either cycle alone.

What was the Iraq-5PP project?

Electrical balance of plant engineering, design and material supply for five combined-cycle plants in Iraq — Taza, Rumaila, Baiji 1 & 2 and Nasiriyah — totalling 3,990 MWe, delivered while Levent Belgin was a project manager at Siemens Power Generation.

Does Belgineer work in oil & gas beyond power generation?

Yes — for example the BOTAŞ Silivri underground natural gas storage project. The focus is on electrical, control and project management scopes.

Do you support projects in the Middle East?

Yes. The Iraq-5PP programme is one example; Belgineer works across Türkiye, Europe and the Middle East.

Have a project inthis discipline?

Tell us where it stands. You will hear back from Levent directly.