Hydro · 2006–2016
Uzunçayır HEPP
3 × 28 MWe EBoP and 154 kV switchyard — Munzur, Tunceli.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 3 × 28 MWe EBoP and 154 kV switchyard
- Location
- Munzur, Tunceli
- Period
- 2006–2016
- Generation capacity
- 84 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 39.12° N, 39.55° E