Hydro · 2006–2016

Uzunçayır HEPP

3 × 28 MWe EBoP and 154 kV switchyard — Munzur, Tunceli.

DAM2 × 135 MWeDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.

Scope
3 × 28 MWe EBoP and 154 kV switchyard
Location
Munzur, Tunceli
Period
2006–2016
Generation capacity
84 MWe
Discipline
Hydroelectric
Organisation
Siemens Power Generation
Role
Project Manager
Coordinates
39.12° N, 39.55° E