A hybrid plant pairing 2.5 MWe of solar with 5 MWe of battery storage for Eninde Energy.
7.5MWe
01Context
Delivered by Bahtiyar Levent Belgin as General Manager & Principal Consultant at Belgineer. The scope, figures and period reflect his project record.
- Scope
- 2.5 MWe solar plant with 5 MWe battery storage
- Location
- Şanlıurfa
- Period
- 2024
- Generation capacity
- 7.5 MWe
- Discipline
- Solar energyBattery storage (BESS)
- Organisation
- Belgineer
- Role
- General Manager & Principal Consultant
- Coordinates
- 37.75° N, 39.32° E