Solar · Storage · 2024

Siverek SPP + BESS

A hybrid plant pairing 2.5 MWe of solar with 5 MWe of battery storage for Eninde Energy.

7.5MWe

PV ARRAY · TRACKING28 / 64 MWeDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as General Manager & Principal Consultant at Belgineer. The scope, figures and period reflect his project record.

Scope
2.5 MWe solar plant with 5 MWe battery storage
Location
Şanlıurfa
Period
2024
Generation capacity
7.5 MWe
Organisation
Belgineer
Role
General Manager & Principal Consultant
Coordinates
37.75° N, 39.32° E