Hydro · 2006–2016
Koçlu HEPP
2 × 18 MWe EBoP, I&C and 154 kV switchyard — Yağlıdere, Giresun.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 2 × 18 MWe EBoP, I&C and 154 kV switchyard
- Location
- Yağlıdere, Giresun
- Period
- 2006–2016
- Generation capacity
- 36 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.86° N, 38.62° E