Hydro · 2006–2016

Koçlu HEPP

2 × 18 MWe EBoP, I&C and 154 kV switchyard — Yağlıdere, Giresun.

DAM2 × 135 MWeDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.

Scope
2 × 18 MWe EBoP, I&C and 154 kV switchyard
Location
Yağlıdere, Giresun
Period
2006–2016
Generation capacity
36 MWe
Discipline
Hydroelectric
Organisation
Siemens Power Generation
Role
Project Manager
Coordinates
40.86° N, 38.62° E