Hydro · 2006–2016

Ören HEPP

4 × 7 MWe EBoP and I&C — Bulancak, Giresun.

DAM2 × 135 MWeDWG BLG-01 · REV ASCALE NTS
01Context

Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.

Scope
4 × 7 MWe EBoP and I&C
Location
Bulancak, Giresun
Period
2006–2016
Generation capacity
28 MWe
Discipline
Hydroelectric
Organisation
Siemens Power Generation
Role
Project Manager
Coordinates
40.94° N, 38.23° E