Hydro · 2006–2016
Egemen 1 & 2 HEPP
22 MWe across two plants, EBoP and I&C — Osmangazi, Bursa.
01Context
Delivered by Bahtiyar Levent Belgin as Project Manager at Siemens Power Generation. The scope, figures and period reflect his project record.
- Scope
- 22 MWe across two plants, EBoP and I&C
- Location
- Osmangazi, Bursa
- Period
- 2006–2016
- Generation capacity
- 22 MWe
- Discipline
- Hydroelectric
- Organisation
- Siemens Power Generation
- Role
- Project Manager
- Coordinates
- 40.20° N, 29.05° E
Have a project inthis discipline?
Tell us where it stands. You will hear back from Levent directly.